Recently, “How do you work?”
was asked on the Lone Star of Texas Quilts for Others Facebook group. Michelle asked if we have several work-in-progress (WIP) going at once, or do we totally
start to finish before going to the next project. The discussion had mixed results.
Some do several at a time – like me! Others must complete before
starting something new!
Bottom line, it is whatever
works! Either way, you are not alone!
I decided to share my WIP list
before the world, get it out into the universe. I need to set goals and get them
done! There are so many more projects I want to do!
Besides the following major
WIP, there are “minor” projects I want to do, like Blessing Bags, Action Quilts
(aka Fidget Quilts), Kennel Quilts, more Prayer Flags, and any Pocket Prayer Quilts when the need arises.
It will be interesting to see
at the end of the year what I’ve accomplished…
Carry Over from
2016 WIP:
1.
Camp Quilt – top is ready, need to quilt and bind and label.
2. Butterflies and Dragonflies Quilt
– ordered fabric arrived, need to finish border, then quilt, bind and label.
3.
Nancy ’s Quilts – design and create at least 3 more
4.
Charm (Beggar)
Quilt – two rows pieced, need total of 6 rows. Cut more 2” squares and stitch
together, join rows, quilt, bind, and label. Will be a *Veteran’s Quilt
Block of the Month (BOM):
5.
Secret Garden –
catch up on the bi-weekly blocks, add sashing, stitch together, quilt, bind,
and label – Will be a *Veteran’s Quilt
6.
Splendid Sampler – half way
through creating the blocks. Add sashing, stitch together, quilt, bind, label –
Will
be a *Veteran’s Quilt
7.
Starry Night – bunches of blocks to make, join together, quilt, bind, label – Will
be a *Veteran’s Quilt
*DEADLINE on the Veteran’s Quilts – July 1, 2017
Totally NEW Must-Do
projects:
THEN: Create
at least 6 more Veteran’s quilts by July – to cover veterans that attend the
American Legion Post’s Cowboy Breakfast!!!
THEN: replace
those quilts for the September’s Cowboy Breakfast
THEN replace
those for the Veteran’s Day program at the local school!!!
Projects I want
to start for Me, our Home:
The Farmer’s Wife 1930’s
Sampler Quilt
And, two wall hangings for my NEW dedicated sewing room!
Yes. I have various projects
going at one time. I love it! I don’t get bored for a lack of something to do!
How do you work?
One project at a time?
or
Several on-going?
No comments:
Post a Comment
Thanks for commenting, it makes my day!